View Reports, News and Statistics Related to Your Home State

Public Review Begins on Revised Outline Stormwater Permit for 60 N.H. Municipalities

Subscribe to our Water Environment News RSS Feed
Category: Water
Type: News
Source: EPA
Date: Tuesday, February 12th, 2013


(Boston, Massachusetts - Feb. 12, 2013) - E.P.A. has released for public review and review a revised outline small "Municipal Separate Storm Sewer System" (MS4) General Permit for 60 New Hampshire communities. The outline permit would update Clean Water Act protections for New Hampshire's environment and waterways.

The revised outline permit updates the previous general permit finalized in 2003. E.P.A. previously released outline general permits for small MS4s in N.H. in 2008. E.P.A. has decided to release revised outline general permits to account for significant public comments received on the 2008 proposal, the availability of updated demographic information from the 2010 Census, and several recently approved TMDLs for various waters in N.H. A Total Maximum Daily Load (TMDL) is a pollution budget developed for specific bodies of water based on a careful evaluation of that water body's specific condition and ecological needs.

The general permits will apply to 60 municipalities located in an urbanized area as defined by the 2010 census. Regulated MS4s include traditional cities and towns, state and federally owned facilities such as universities and military bases, and the state transportation agency (NHDOT). The outline general permits will apply to all the regulated MS4s, although waivers are possible for eligible municipalities within the urbanized area where population is less than 1,000.

The outline general permits, when finalized, would require regulated small MS4s to develop, implement and enforce a Stormwater Management Plan (SWMP) designed to control pollutants to the maximum extent practicable, protect water quality and satisfy appropriate requirements of the federal Clean Water Act. The outline permit would do this with requirements to address waste load allocations associated with approved TMDLs for bacteria, phosphorus and chloride, and requirements to address discharges to impaired waters which do not have an approved TMDL.

The outline permit requires implementation of 6 minimum control measures, including: public education and outreach, public participation, illicit discharge detection and elimination, management of construction location runoff, management of runoff from new development and redevelopment, and good housekeeping in municipal operations. The outline permit identifies 4 target audiences for public education, details specific procedures to locate and remove illicit connections, encourages low impact development practices and identifies practices to address phosphorus, bacteria, chloride and nitrogen. E.P.A. has provided a suggested format for information which can be submitted electronically. E.P.A. will provide templates for the SWMP and the yearly reports.

E.P.A. received over 100 comments on the 2008 outline permit. The new outline permit addresses many comments received on that earlier outline permit, including: (1) providing additional time for completing required tasks; (2) providing opportunities to optimize activities such as catch basin cleaning, rather that mandating a set frequency; (3) reducing the required frequency of street sweeping; (4) reducing costs associated with monitoring by allowing the use of field test kits; and (5) including provisions to address nitrogen in Great Bay. The revised outline permit removed provisions such as sweeping sidewalks and walking stream miles which were viewed as impractical by many commenters.

E.P.A. has estimated the costs associated with implementation of the minimum control measures, but does not have sufficient information to reasonably estimate those associated with achievement of water quality based limitations found in established TMDLs. Actual municipality costs will vary depending on a number of factors including, but not limited to, population (1,000 to 100,000), resources, infrastructure (number of catch basins, road miles), size of the urbanized area, and work completed during previous permit term. As drafted, E.P.A. estimates the cost to meet the requirements associated with implementation of the 6 minimum control measures to be between $78,000 and $829,000 per year averaged over the permit term.

The N.H. communities affected by the new outline permit are: Allenstown, Amherst, Atkinson, Auburn, Barrington, Bedford, Bow, Brentwood, Candia, Chester, Danville, Derry, Dover, Durham, East Kingston, Epping, Exeter, Fremont, Goffstown, Greenland, Hampstead, Hampton, Hampton Falls, Hollis, Hooksett, Hudson, Kingston, Lee, Litchfield, Londonderry, Lyndeborough, Madbury, Manchester, Merrimack, Milford, Milton, Mont Vernon, Nashua, New Castle, Newfields, Newington, Newmarket, Newton, North Hampton, Pelham, Pembroke, Plaistow, Portsmouth, Raymond, Rochester, Rollinsford, Rye, Salem, Sandown, Seabrook, Somersworth, South Hampton, Stratham, Wilton, and Windham.

More information:

The outline general permit has been published in the Federal Register. Public comments must be submitted by April 15, 2013 (see: https://www.federalregister.gov/articles/2013/02/12/2013-03055/notice-of-availability-of-the-draft-issuance-of-the-small-municipal-separate-storm-sewer-system) .

A formal public hearing will be held on March 14, 2013 at the NHDES - Pease Field Office from 2:00 p.m. - 5:00 p.m. E.P.A. will also host a series of public meetings to explain the permit requirements and answer questions. One of these meeting will be focused on newly regulated municipalities.

The outline permit, further background information and specific information on meeting locations and times is and will be accessible at: (http://www.epa.gov/region1/npdes/stormwater/MS4_2013_NH.html) .

  User Comments  
There are currently no comments for this story. Be the first to add a comment!
Click here to add a comment about this story.
  Green Tips  
Tune up your lawn mower once a year. This simple-to-do task takes 30 minutes or less and cuts your mower's emissions by up to 50 percent and fuel consumption up to 30 percent.
  Featured Report  
Air Quality Index Report
View the number of unhealthy air quality days since 1990

View Report >>

  Green Building  
Sustainable Building Advisor Program- The Next Great Step
Beyond LEED - check out The Sustainable Building Advisor Program....Read Complete Article >>

All Green Building Articles