View Reports, News and Statistics Related to Your Home State

Cleanup Begins at the Lincoln Metals Location in Lincoln, Ala.

Subscribe to our Emergency Response Environment News RSS Feed
Category: Emergency Response
Type: News
Source: EPA
Date: Tuesday, May 13th, 2008

(Atlanta, Ga. - May 13, 2008) E.P.A. began a removal action at the Lincoln Metals location in Lincoln, Ala. on May 12, 2008. The removal action is a short-term cleanup intended to stabilize the Location and remove any hazards it may pose to human health and the environment. The removal action may take up to three months at an estimated cost of approximately is $2.5 million.

Work at the Location may include:

- Mobilization and Location preparation;
- Excavation, disposal and removal of lead-contaminated soils from the foundry property, an off-site ditch, a public park, and a residential yard
- Assessment of an additional property;
- Demolition and disposal of the foundry building;
- On-site stabilization of soils and debris, as necessary, before transportation to approved disposal facilities; and
- Restoration of a residential yard, a public park, and the foundry property.

The Lincoln Metals Location is an inactive brass foundry that operated in Lincoln, Talladega County, Alabama from 1956 to 2001. The facility was built circa 1947. During March 2001, Heartland Faucet declared bankruptcy and in November 2001, Silvercrown Investments, purchased the company out of bankruptcy.

In August 2006, Alabama Department of Environmental Management referred the Location to E.P.A. requesting the abandoned property be considered for immediate response under Federal authority. In January 2007, EPA's Emergency Response and Removal Branch (ERRB) conducted a removal Location assessment and determined that further evaluation was required.

In May and July of 2007, E.P.A. conducted additional soil sampling at the Location to determine the nature and extent of contamination at the Location and adjacent properties. The 2007 assessments revealed the presence of lead contaminated soils above EPA's removal action levels at the site. As a result of the direct threat of potential contact with contaminated soils, a removal action was approved on March 26, 2008.

To obtain further information about the activities to be conducted at the site, please contact Sherryl Carbonaro, E.P.A. Community Involvement Coordinator, at (800) 564-7577. Citizens with health concerns associated with potential lead exposure should contact Cheryl Browder, Alabama Department of Public Health, Talladega County, at (800) 201-8208 or consult with your family physician.

  User Comments  
There are currently no comments for this story. Be the first to add a comment!
Click here to add a comment about this story.
  Green Tips  
You can assume that each 5 mph you drive over 60 mph is like paying an additional $0.24 per gallon for gas.
  Featured Report  
Air Quality Index Report
View the number of unhealthy air quality days since 1990

View Report >>

  Green Building  
Sustainable Building Advisor Program- The Next Great Step
Beyond LEED - check out The Sustainable Building Advisor Program....Read Complete Article >>

All Green Building Articles