View Reports, News and Statistics Related to Your Home State

Maralex Disposal to pay $89,900 penalty to resolve Safe Drinking Water Act violations at disposal well on Southern Ute Reservation (Colo.)

Subscribe to our Compliance/Enforcement Environment News RSS Feed
Category: Compliance/Enforcement
Type: News
Source: EPA
Date: Monday, August 5th, 2013


(Denver, Colo. - Aug 5, 2013) E.P.A. today announced that Maralex Disposal, LLC (Maralex) has been found liable for violations of the Safe Drinking Water Act at its commercial brine disposal injection well in La Plata County, Colorado on the Southern Ute Reservation. Maralex was assessed a penalty of $89,900.

The decision issued by an administrative judge following a hearing in October 2012, upheld EPA's finding of violations of Underground Injection Control (UIC) permit requirements at Maralex's Dara Ferguson Injection Well #1, a large-capacity disposal well that injects brine and production wastes to an injection zone approximately 8,000 feet below the surface. These violations, which include failure to maintain mechanical integrity of the well, failure to monitor as required, and inaccurate reporting, were discovered through E.P.A. inspections and reports received from the company.

On May 5, 2010, E.P.A. inspected the Maralex injection well and observed excess annulus pressure, indicating a problem with the well's mechanical integrity and the likelihood of a leak in the system. A follow up inspection on May 26 again indicated excess pressure. E.P.A. issued a Notice of Violation and instructed Maralex to submit a work project to fix the violations. Although a letter from the company, dated July 8, 2010, described the potential for a leak and steps the company would take to repair the well, an E.P.A. inspection in April 2011 discovered that the disposal well, although still in operation, had not been repaired as described. E.P.A. subsequently issued a 2nd NOV and ordered the company to shut down the well until repairs were complete. Maralex completed the repairs and conducted a successful mechanical integrity test on May 24, 2011, at which time E.P.A. authorized the company to resume injection into the well.

"Companies that dispose of production wastes into the subsurface are responsible for taking steps to ensure injection wells are not leaking," said Mike Gaydosh, director of EPA's enforcement plan in Denver. "Compliance with these monitoring and mechanical integrity requirements minimizes the risk of waste fluids moving into aquifers and prevents the contamination of drinking water sources."

The EPA-issued UIC permit authorizes Maralex to inject produced water into Dara Ferguson Well #1, which disposes over 60,000 barrels of waste fluids monthly to a designated injection zone. These fluids contain high concentrations of saline produced water, benzene, toluene, ethylbenzene, and xylene.

Compliance with UIC permit requirements protects overlying aquifers from contamination.

Groundwater contamination, especially brine, is often very difficult or not possible to address and can destroy underground sources of drinking water. Routine monitoring and the maintenance of mechanical integrity in waste disposal wells are critical requirements of EPA's UIC regulations.

For more information on EPA's Underground Injection Control plan please visit: http://water.epa.gov/type/groundwater/uic/


  User Comments  
There are currently no comments for this story. Be the first to add a comment!
Click here to add a comment about this story.
  Green Tips  
You can assume that each 5 mph you drive over 60 mph is like paying an additional $0.24 per gallon for gas.
  Featured Report  
Trash & Recycling By Non-Durable Goods
View charts showing the trash generation and recycling rates of various non-durable goods

View Report >>

  Green Building  
Sustainable Building Advisor Program- The Next Great Step
Beyond LEED - check out The Sustainable Building Advisor Program....Read Complete Article >>

All Green Building Articles