View Reports, News and Statistics Related to Your Home State

E.P.A. Settlements Restore Wetlands Across Southeast

Subscribe to our Compliance/Enforcement Environment News RSS Feed
Category: Compliance/Enforcement
Type: News
Source: EPA
Date: Tuesday, March 4th, 2014


ATLANTA - Over the past fiscal year (Oct. 1, 2012 to Sept. 30, 2013), the E.P.A. (EPA) Region four has cited 23 entities throughout the Southeast for depositing dredged and/or fill material into wetlands or other waters of the U.S. in violation of Section 404 of the Clean Water Act (CWA). Such unauthorized discharges threaten water quality and damage habitats.

As part of the settlements, the responsible parties in Florida, Georgia, Kentucky, Mississippi, North Carolina, South Carolina and Tennessee will spend an estimated $1.7 million on restoration and monitoring activities. 7 entities were additionally assessed a total of $130,800 in civil penalties. The settlements and associated penalties, if applicable, include:

Florida
· Florida Properties III, LLC, violations during construction of the Coconut Inlet development in Lee Co. (estimated cost of injunctive relief of $137,200).

· Dr. Cory Gaiser, violations during road and pond construction in Jackson Co. (estimated cost of injunctive relief of $17,020).

· Mr. James Johnson, violations during preparation property for commercial development in Collier Co. (estimated cost of injunctive relief of $28,002).

· Northwest Florida Holdings, Inc., violations during the dredging of a manmade basin and Saint Andrew Bay in Bay Co. (estimated cost of injunctive relief of $165,038).

· Mr. Robert J. Chelico, violations during clearing and grading activities associated with construction of a residence in Escambia Co. (estimated cost of injunctive relief of $15,300).

· Peace River Properties Investment, LLC, violations during construction of a residential development, in Charlotte Co. (estimated cost of injunctive relief of $28,496).


Georgia
· Community Bank of Pickens County, violations during construction of a commercial development in Pickens Co. (estimated cost of injunctive relief of $162,570).

· Millrock Farms, Inc., violations during the construction of ponds, roads and other water retention features in Laurens Co. (estimated cost of injunctive relief of $10,138).

· Mr. Robert Lee, violations during construction of a borrow pit in Chatham Co. (estimated cost of injunctive relief of $13,246).

· Camden USA, Incorporated and Camden Development, Inc., violations during construction of stormwater runoff structures at the Camden Paces development in Fulton County.

· Ray Flow and Rick Wagner, violations during construction of access roads in Tattnall Co. (civil penalty of $1500).



· Mr. Milton Blankinship, violations associated with ditching activities intended to drain wetlands on his property in Jackson Co. (civil penalty of $10,500).

Kentucky

· Montgomery Group, LLC, violations during the construction of the Skylar Landing Commercial Development in Mercer Co. (estimated cost of injunctive relief of $45,440).

· Mr. Bill Brock, violations during the conversion of forested wetlands to agricultural use in Laurel Co. (estimated cost of injunctive relief of $31,786).

· Hardin Co. Developers, violations during construction of the Cowley Crossing Subdivision in Hardin Co. (civil penalty of $30,000).


Mississippi
· Hancock Co. Land, LLC, violations during location preparation for a development in Hancock Co. (estimated cost of injunctive relief of $881,555).

· Mr. Horace Scott Slay, Sr., violations in Jackson Co. (civil penalty of $18,000 and estimated cost of injunctive relief of $11,800).

· Jackson Co. Recreation Department, violations during location preparation for the construction of recreational and parking facilities in Jackson Co. (civil penalty of $27,350).


North Carolina
· Southwood Developers, Inc., and CKC, LLC, violations during construction of the Windsor Park residential development in Brunswick Co. (civil penalty of $11,000 and estimated cost of injunctive relief of $43,069).

South Carolina
· Mr. Lowell Landon, violations during construction of a residential development in Beaufort County.

· Mr. William S. Livingston, III, violations during mechanized land clearing in preparation for forestry activities in Horry Co. (estimated cost of injunctive relief of $109,338).

· Bass Waccamaw River Ranch, LLC, violations during construction of roads and food plots in Horry Co. (civil penalty of $37,500).


Tennessee
· Mr. Randall Stutts, violations during the construction of an earthen dam and impoundment of an unnamed tributary to the Harpeth River in Cheatham Co. (estimated cost of injunctive relief of $33,180).

Congress enacted the CWA in 1972 to protect the nation's rivers, lakes and stream, as well as some of the more fragile and vital wetland habitats. Wetlands are acknowledged as important features in the landscape that serve to protect and enhance water quality, provide fish and wildlife habitats, store floodwaters, and maintain surface water flow during dry periods. The CWA requires anyone engaged in construction within or disposal to waters of the U.S. to obtain permits when altering or filling waterways. The U.S. Army Corps of Engineers issues permits to discharge dredged and/or fill material into waters of the U.S.

For more information about the CWA Section 404 wetland regulatory authorities, visit: http://www.epa.gov/owow/wetlands/pdf/reg_authority_pr.pdf

For more information about wetlands protection in the Southeast, visit:
http://www.epa.gov/region4/water/wetlands/index.html

Connect with E.P.A. Region four on Facebook: www.facebook.com/eparegion4

And on Twitter: @EPASoutheast

  User Comments  
There are currently no comments for this story. Be the first to add a comment!
Click here to add a comment about this story.
  Green Tips  
Walk, bike, car poolor use mass transit. If you leave your car at home two days a week, you'll reduce CO2 emissions by 1,590 pounds a year.
  Featured Report  
Trash & Recycling By Non-Durable Goods
View charts showing the trash generation and recycling rates of various non-durable goods

View Report >>

  Green Building  
Sustainable Building Advisor Program- The Next Great Step
Beyond LEED - check out The Sustainable Building Advisor Program....Read Complete Article >>

All Green Building Articles