View Reports, News and Statistics Related to Your Home State

E.P.A. Submits Final Report on 1st Phase of Hudson River Dredging For Independent Scientific Review; 45-day Public Review Period Begins Today

Subscribe to our Hazardous Waste Environment News RSS Feed
Category: Hazardous Waste
Type: News
Source: EPA
Date: Monday, March 8th, 2010

(New York, N.Y.) After completing the 1st phase of dredging PCB-contaminated sediment in the upper Hudson River, E.P.A. today released a detailed technical assessment of the work to a panel of independent scientific experts for review. The E.P.A. report and a similar one prepared by the General Electric Company (GE) are being submitted to the panel in accordance with the arrangement under which GE performed the 1st phase of the dredging, to ensure that the Hudson River dredging plan is evaluated using the best scientific and technical information. The E.P.A. report details the effectiveness of the 1st phase of dredging, as well as the challenges encountered during the 1st dredging season. It also lays out the Agency's modifications to the engineering performance requirements for dredging resuspension, residuals, and productivity suggested for the 2nd phase of the project, set to begin in 2011.

"The Hudson River is a magnificent resource that has been negatively impacted by PCB pollution for decades," said Judith Enck, E.P.A. Regional Administrator. "The completion of the 1st phase of dredging, while not without problems, has gone very well and is moving us closer to achieving the goal of a cleaner Hudson River. The problems in Phase one will be addressed during the careful scientific review, which is now underway."

During the independent peer review, E.P.A. is also seeking public comments on the reports, which replace outline versions released last month. These comments will be provided to the panel members for consideration during their evaluation.

The panel has been asked to consider certain questions relating to the engineering performance requirements and the monitoring plan for Phase two of the project. EPA's report includes the New York State Department of Environmental Conservation's observations and recommendations as an appendix. The peer review panel will publicly discuss its views on the E.P.A. and GE reports in May 2010. The panel members will then submit their individual views on the questions presented to them by EPA; these views will be compiled into a report, which is expected to be complete by the end of June.

Once the peer review report is completed, E.P.A. will consider the panel's recommendations and determine whether changes to the performance requirements should be made. E.P.A. will inform GE about any modifications required during the 2nd phase of the dredging project, and GE will then have the option to agree to conduct Phase 2. If the company agrees to perform Phase 2, the work will be carried out under the terms of the consent decree. If GE does not agree to conduct the Phase two dredging, E.P.A. fully reserves all of its enforcement authorities, including its right to direct the company to perform the dredging and/or sue in district court to require GE to perform Phase two or to reimburse E.P.A. for its costs if the Agency conducts Phase two using government funds.

EPA's report will be posted on the Web late this afternoon at http://www.hudsondredgingdata.com/report, and GE's report can be found at http://www.hudsondredging.com. E.P.A. encourages the public to submit comments on the evaluation reports at a designated Web site, http://www.hudsondredgingdata.com/comments. The public can review from any computer with Internet access, including computers at the Agency's Hudson River Field Office in Fort Edward, at libraries, or at the information repositories established for the site. The Web location allows members of the public to print copies of their comments and gain a confirmation that their comments have been received. In addition, written comments can be mailed to the Hudson River Field Office at 421 Lower Main Street, Hudson Falls, New York, 12839.

From approximately 1947 to 1977, the GE discharged as much as 1.3 million pounds of PCBs from its capacitor manufacturing plants at the Hudson Falls and Fort Edward facilities into the Hudson River. The primary health risk associated with the location is the accumulation of PCBs in the human body through eating contaminated fish. Since 1976, high levels of PCBs in fish have led New York State to close various recreational and commercial fisheries and to issue advisories restricting the consumption of fish caught in the Hudson River. PCBs are considered probable human carcinogens and are linked to other adverse health effects such as low birth weight, thyroid disease, and learning, memory, and immune system disorders. PCBs in the river sediment also affect fish and wildlife.

Information about the Hudson River PCBs Superfund location can be found at: http://www.epa.gov/hudson. Residents with questions are encouraged to contact E.P.A. Community Involvement Coordinator Kristen Skopeck at 518-747-4389, skopeck.kristen@epa.gov, or the project's hotline number at 1-888-596-3655. Information repositories for this location include the following: Crandall Public Library, 251 Glen Street, Glens Falls, NY; Adriance Memorial Library, 93 Market Street, Poughkeepsie, NY; Superfund Records Center, E.P.A. Region 2, 290 Broadway, 18th floor, New York, NY; Saratoga Co. EMC, 50 West High Street, Ballston Spa, NY; Hudson River Field Office, 421 Lower Main Street, Hudson Falls, NY; Edgewater Public Library, 49 Hudson Avenue, Edgewater, NJ; New York State Library, CEC Empire State Plaza, Albany, NY.

For a Google Earth aerial view of the Hudson River PCBs dredging plan area go to: http://www.epa.gov/region02/kml/hudson_dredging_project_area.kml
(You must have Google Earth installed on your computer to view the map. To download Google Earth, visit http://earth.google.com/download-earth.html).

10-030

  User Comments  
There are currently no comments for this story. Be the first to add a comment!
Click here to add a comment about this story.
  Related Pages  
E.P.A. Declares Requirements for Next Phase of Hudson River PCB Cleanup
... it in November 2009. E.P.A. conducted a comprehensive review of the science and considered the views of a group of independent scientific experts following the completion of the 1st phase. In the 1st phase of the ...
“An Historic Day for an Historic River”; E.P.A. Declares Start of Hudson River Dredging
... N.Y.) The long awaited and historic dredging of the Upper Hudson River to remove PCB-contaminated sediment began today near Roger ... the Hudson River PCBs dredging plan area go to: http://www.epa.gov/region02/kml/hudson_dredging_project_area.kml ...
E.P.A. Orders Access To Construct Alternate Water Line For Hudson Dredging Plan
(New York, N.Y.) To ensure that contingencies are in place to protect drinking water supplies during Hudson River dredging, E.P.A. today issued orders to the town of Halfmoon, New York and the Water ...
E.P.A. Chooses Final Dewatering Sites for Use in Hudson River PCBs
... , New York have been selected as the dewatering and /or sediment transfer sites for the Hudson River PCBs cleanup . The specific operations to be performed at each of the sites will be determined after transportation ...
E.P.A. Finalizes Dredging Performance Requirements and Approves Preliminary Design for Hudson River Cleanup
... released the Preliminary Design Report for the Hudson River PCBs Location . This report was prepared by General Electric Company (GE). It presents the 1st stage of the design for the Hudson River PCBs Superfund Location cleanup. ...
E.P.A. and General Electric Reach Arrangement on Design of Hudson River Cleanup
(#03097) The E.P.A. (EPA) announced today that it has signed an arrangement with General Electric Company (GE) to perform the plan design work for the cleanup of PCB-contaminated sediment in the Hudson River. Under ...
E.P.A. and General Electric Reach Outline Arrangement on Next Steps in Hudson River Cleanup
... step toward cleaning up PCB-contaminated sediment in the Hudson River by reaching a outline arrangement with the General Electric Company (GE) to perform the plan design work required before dredging can ...
E.P.A. Suggests Comprehensive Project to Clean Up Hudson River PCBs; Suggestion Based on Extensive Scientific Study of PCB Risks to People and Wildlife
... between the Federal Dam at Troy and Hudson Falls. All of the science was peer reviewed by independent scientific experts. E.P.A. considered public comments, including submissions from GE, throughout its review over the ...
E.P.A. To Continue Work on Hudson River PCBs Assessment; No Immediate Action Planned
... . It is estimated that in excess of one million pounds of PCBs were discharged into the Hudson River from 2 General Electric (GE) capacitor manufacturing plants in Fort Edward and Hudson Falls, New York during ...
Hudson River Reassessment Schedule Released; Suggested Project Due By December 2000
... were discharged into the Hudson River over a 30-year period ending in 1977 from 2 General Electric (GE) capacitor plants ... results of sediment sampling conducted in the upper Hudson River to confirm 1984 DEC data used to estimate the mass of PCBs in sediments ...
Related Searches
upper hudson river today released submits final report
independent scientific review day independent scientific experts hudson river dredging plan
hudson river dredging general electric company ge ge performed
evaluated using dredging pcb contaminated sediment detailed technical assessment
1st phase   
  Green Tips  
Use electronic media. Make greater use of electronic media and limit the number of E-mail messages you print out.
  Featured Report  
CO2 Emissions by Fuel
View the total CO2 emissions broken down by Coal, Petroleum, and Natural Gas

View Report >>

  Green Building  
Sustainable Building Advisor Program- The Next Great Step
Beyond LEED - check out The Sustainable Building Advisor Program....Read Complete Article >>

All Green Building Articles